Reply within 12 hours on working days 9 years in export · 30+ countries
Shenzhen 3C supply belt
Home / Factory

Production Lines on Shenzhen's 3C Belt

This city accounts for roughly one sixth of China's electronic information manufacturing output. Our lines, engineers and QC teams are based inside that cluster — as close to chips, tooling and materials as it gets.

The Belt Behind Us

Why Shenzhen Is the Heart of Global 3C Accessories

2.48trn CNY
Shenzhen electronic information manufacturing output (2022, about 1/6 of China)
5trn+
Shenzhen industrial output above designated size (2024, first Chinese city above 5 trillion CNY)
32yrs
Shenzhen ranked No.1 among Chinese cities by export volume (through 2024)
71%
Share of electromechanical products in Shenzhen's exports (2024)

Sources: Shenzhen Municipal Government (sz.gov.cn), 2022-2024 data; Xinhua Net, 2025.

Cluster & Ecosystem

From Huaqiangbei to the One-Hour Component Circle

Huaqiangbei: China's No.1 Electronics Street

Over 115,000 registered businesses packed into 1.45 square kilometers, with more than 1 million electronic component varieties — the first stop for part selection, sourcing and prototyping.

One-Hour Component Circle

Chips, structural parts and final assembly coordinate within roughly a one-hour commute — the physical foundation of fast design iteration.

A World-Class Electronics Cluster

Longgang hosts the world's third-largest electronic information cluster, and neighboring Dongguan adds another trillion-CNY cluster — capacity depth sits right next door.

Sources: Shenzhen Government Online; Xinhua News Agency reporting, 2024-2026.

TECHORIGIN production line
Our Lines

4,800 Square Meters of Full-Chain Production

2 SMT lines, 4 assembly lines and 1 aging room; 150+ staff including 12 R&D and 9 QC engineers. From placement and assembly to aging and dispatch, critical processes never leave the building.

  • Monthly capacity: 300,000 chargers / 800,000 cables / 120,000 pairs of TWS earbuds
  • Dual gateways at Shenzhen Port and Bao'an Airport, with long-term stable battery-compliant channels
  • On-site and video factory audits supported; third-party inspection can be arranged
Book a Factory Audit
QC Checkpoints

Five Gates, No Defect Sleeps Over

1
Incoming Inspection

Cells, ICs and structural parts sampled by supplier batch

2
SMT Stage Check

AOI optical inspection plus first-article confirmation

3
Assembly 100% Check

Appearance, function and electrical safety checked unit by unit

4
Aging Test

100% aging for charging products; batch cycling for audio

5
Pre-Shipment Sampling

AQL-based sampling with retained samples; third-party inspection welcome

See Our Quality & Compliance System
Out of Shenzhen

Transit Time Reference for Major Markets

Common door-to-door transit ranges from Shenzhen (floating with peak seasons and routes); battery-powered goods travel on IATA-compliant channels.

Channel Destination Typical Transit Best For
Air express lineUnited States / EuropeAbout 8-12 daysHigh-value goods and urgent restocking
Matson fast sea expressUS West CoastAbout 18-23 daysMainstay for overseas warehouse restocking
Europe sea expressMajor European portsAbout 32-37 daysPlanned restocking and bulk orders
Battery-line parcelMajor US/EU marketsAbout 8-18 daysDirect shipping of built-in batteries (UN38.3 terms)

Transit ranges per freight-forwarder published schedules, 2024-2026; battery shipments arranged per IATA DGR (UN38.3, PI965/966/967).

Seeing Is Believing: Visit the Lines in Shenzhen

Choose on-site audits, video audits or third-party inspection — we arrange the itinerary and documentation.